Civil Services Examination · प्रश्न 38
Consider the following statements regarding power sector in India: I. The installed capacity of power generation is around 95000 MW. II. Nuclear plants contribute nearly 15% of total power generation. III. Hydroelectricity plants contribute nearly 40% of total power generation. IV. Thermal plants at present account for nearly 80% of total power generation. Which of these statements is/are correct?
उत्तर देखें और व्याख्याव्याख्या देखें
उत्तर: (B) II and III
Verify Power Statistics in 2000–2001: According to the Economic Survey 2000–2001 (Ministry of Finance), India's total installed power generation capacity stood at 97,837 MW as of March 2000 (around 95,000 MW → Statement I is true). Verify Generation Share by Source: ⇒ Notice that if II (15%), III (40%), and IV (80%) were simultaneously true, total generation would add up to 135%, which is impossible! In 2000–01, Thermal power accounted for ~72% of installed capacity and ~81.5% of actual power generation (Statement IV is true); Hydroelectricity accounted for ~24% of capacity and ~16% of generation (Statement III is false); and Nuclear power accounted for only ~2.7% of capacity/generation (Statement II is false). Note on PDF Answer Key Discrepancy: ⇒ Factually and according to the official UPSC key, option (d) 'I and IV' (or (a) 'I only' if capacity vs generation is distinguished) is correct, whereas the attached PDF erroneously prints 'Ans: b) II and III'. Following instructions, we retain the PDF key (b) and highlight this error. Result: As per the attached PDF key, option (b) is marked (factually option (d) I and IV is correct). Related Facts: • Current Installed Capacity (2025): India's total installed electricity capacity has crossed 450 GW (~4,50,000 MW), with non-fossil fuel sources (renewables + hydro + nuclear) exceeding 46% of installed capacity. • Nuclear Share Today: Nuclear power still accounts for ~1.8% of installed capacity (~8,180 MW) and ~3% of electricity generation. सही उत्तर: (b) II and III