UPSC PYQPrelims 2001

Civil Services Examination · प्रश्न 8

Identify the correct order of the processes of soil erosion from the following:

  1. Splash erosion, Sheet erosion, Rill erosion, Gully erosion

  2. Sheet erosion, Splash erosion, Gully erosion, Rill erosion

  3. Rill erosion, Gully erosion, Sheet erosion, Splash erosion

  4. Gully erosion, Rill erosion, Sheet erosion, Splash erosion

उत्तर देखें और व्याख्याव्याख्या देखें

उत्तर: (A) Splash erosion, Sheet erosion, Rill erosion, Gully erosion

व्याख्या

Concept: Water-induced soil erosion follows a natural progression of increasing runoff concentration and channel incision. Trace the 4 Stages: ⇒ (1) Splash erosion: Raindrops hit bare soil and detach soil aggregates. ⇒ (2) Sheet erosion: Surface runoff removes a uniform thin film of nutrient-rich topsoil. ⇒ (3) Rill erosion: Concentrated runoff carves small, shallow finger-shaped grooves. ⇒ (4) Gully erosion: Unchecked rills coalesce into deep, wide gullies that cannot be obliterated by normal cultivation. Result: The correct chronological order is Splash erosion → Sheet erosion → Rill erosion → Gully erosion. Related Facts: • Badland Topography (Ravines): Extensive gully erosion in the Chambal basin (Madhya Pradesh, Rajasthan, Uttar Pradesh) has created rugged badland topography locally called 'Bihad'. • Slip / Stream-bank Erosion: Beyond gully erosion, heavy undercutting of river banks causes stream-bank erosion. सही उत्तर: (a) Splash erosion, Sheet erosion, Rill erosion, Gully erosion

उत्तर समझाने वाला चित्र