RRB NTPC · Question 100
If 9 students can prepare 117 charts in 3 hours, how many students are needed to prepare 208 charts in 1 hour?
Show answer & explanationShow explanation
Answer: (A) 48 students
GIVEN / CONCEPT: M₁ = 9 students, H₁ = 3 hours, W₁ = 117 charts; H₂ = 1 hour, W₂ = 208 charts. Apply the work-rate formula: (M₁ × H₁) / W₁ = (M₂ × H₂) / W₂ Simplification / Calculation: ⇒ (9 × 3) / 117 = (M₂ × 1) / 208 Verification / Deduction: ⇒ 27 / 117 = M₂ / 208 ⇒ 3 / 13 = M₂ / 208 ⇒ M₂ = 3 × 16 = 48 students RESULT / TAKEAWAY: 48 students are needed to prepare 208 charts in 1 hour. Correct Answer: (a) 48 students
