SSC CGL – Combined Graduate Level Examination · Question 65
An express train covers a fixed distance in 40 minutes at an average speed of 200 km/h. Due to construction work, it needs to be diverted, increasing the distance by 25%. If the train needs to arrive at its destination on time (in 40 minutes), what should its new average speed be in km/h?
Show answer & explanationShow explanation
Answer: (A) 250 km/h
Original distance: 200 × (40/60) = 133.33 km. New distance: 133.33 × 1.25 = 166.67 km. New speed: 166.67 ÷ (40/60) = 250 km/h. Shortcut: Time is the same, so speed must increase by the same 25% → 200 × 1.25 = 250 km/h. Correct Answer: (a) 250 km/h
